In the studioZen — a little more clarity for ambitious work
sico studio®
Open workspace

Zen / Shaping

/wayfinder

Map a big ambition into decisions you can see.

npx skills@latest add sico-vibes/zen-skills --skill zen zen-wayfinder

Public repository release pending. Install the router with this mode for shared references and the local record writer.

Keep the destination understandable while choosing the next useful step. This is a decision map, not an implementation checklist disguised as a plan.

  1. Read the original goal, accepted changes, latest handoff and specifications. Put every requested capability in a coverage ledger. Keep deferred work explicit; do not quietly reduce a complete build to a small demo.
  2. Map settled decisions and their evidence. Group unresolved questions by dependency: which unlocks another, which facts need research and which interactions need a prototype. Label assumptions.
  3. Show a compact map/table with destination, current evidence, uncertainty, resolution method and owner. Use a diagram when it clarifies dependencies, keeping the text usable without it.
  4. Select the next frontier that reduces consequential uncertainty. Settled work may move to spec/tasks while independent research continues when resources and authority permit. Do not invent dependencies merely to force a model/agent arrangement.
  5. Define checkpoints as observable outcomes, not scope cuts. Name how each is demonstrated and what it does not prove. Keep integration/production evidence separate from fixtures and source inspection.
  6. Update the map when new evidence changes a decision and preserve superseded reasoning. Before pausing write a handoff with destination, current frontier and exact next action.

Output and persistence

Use the wayfinder map in a DOC with data.kind: "wayfinder", linked to IDE/RDT/ART/spec/task records. Use actual MCP writes or the standalone writer. If absent, deliver a labelled draft; never claim a saved ref. Shared state and authority are in workflow.md.

Example: a remote dashboard needs durable delivery before refresh can prove a write. Device authentication, idempotency and local persistence are separate uncertainties. A connection badge is one observation, not the completed loop. End with complete scope coverage, settled choices, the remaining frontier and one concrete next action.